Towards the Lüneburg Boat Lift
On Sunday, we left Mölln harbour – an hour and a half later than planned after falling into bed exhausted the night before.
The youngsters wanted to experience the boat lift at Lüneburg, known in German as the Schiffshebewerk Lüneburg. Niklas worked out that they could be back in Copenhagen that evening if they caught the 16:35 train from Lüneburg. Carl did the calculations and concluded that they could just make it if we dropped them off immediately after the boat lift.
The Lüneburg boat lift raises vessels 38 metres. Its enormous trough contains 11,800 tonnes of water, and the journey takes about 20 minutes.
We continued along the Elbe-Lübeck Canal, passed through two locks, spent 400 metres on the River Elbe and then turned into the Elbe-Seitenkanal.
The Elbe-Seitenkanal
The Elbe-Seitenkanal connects the Elbe with the Mittelland Canal. It is 115 kilometres long and opened to traffic in 1976. It was built to connect the West German section of the Elbe with the Mittelland Canal.
The canal also had a Cold War purpose: its high embankments were intended to form an obstacle to tanks in the event of an attack from the east.
Peace and Quiet on the Canal
It was really hot. Niklas cooled off in the water on a rope behind the boat, Daniel sat at the helm, and Emilie relaxed on the foredeck.
Everything was peaceful.
Until Suddenly We Were in a Hurry
Waiting at the two locks – and then waiting again at the boat lift – had eaten into our schedule. Suddenly, the peaceful afternoon was replaced by a slightly frantic discussion about how on earth they were going to catch their train.
The original plan was to walk the four kilometres from the boat lift to the station. If they could get a taxi instead, there was still a chance.
Niklas managed to book one to meet them at the boat lift at 16:00.
Taking the Lüneburg Boat Lift
Going up in the boat lift was quite an experience. We could look 38 metres down to where we had come from. The huge structure lifted us surprisingly quickly and, despite its enormous size, sounded almost like an ordinary elevator.
Immediately after the lift, we dropped the youngsters off.
They climbed over a fence and ran down a steep road carrying suitcases and bags. The taxi was waiting as promised.
They caught the train, caught the ferry and were back home at 22:30 – exactly according to plan.
Carl and I continued towards Uelzen. It took another three and a half hours, and we arrived at 19:30.
The Water Level Can Fall Quickly
There was very little water in the harbour.
The harbourmaster warned us not to enter because our draught was 1.53 metres. But at the outer end of the harbour was a boat we had travelled with the day before. We knew she drew 1.60 metres.
If she could get in, surely we could too.
There were very few harbours along this stretch and darkness was approaching, so we decided to try. At low speed, we carefully crept in behind the other boat.
To the harbourmaster’s surprise – and our considerable relief – we made it without a problem.
He did, however, warn us that the water level could rise or fall by as much as 40 centimetres within minutes.
Fortunately, it stayed where it was, and we got out again without difficulty the following morning.
The Lock at Uelzen
We had not been underway for long when we reached the lock at Uelzen.
Carl called the lock keeper on the VHF. He asked for our length and told us that we would be locking through with Niedersachsen 2 – an enormously long barge waiting at the commercial quay.
We were instructed to tie up at the short section reserved for Sportboote and wait.
“Und jetzt die Sportboote”
When the light at the lock turned green, the enormous barge moved towards the lock.
Then suddenly the loudspeaker crackled:
“Und jetzt die Sportboote” – followed by something else we didn’t quite understand.
Niedersachsen 2 filled almost the entire 185-metre lock. We rather humbly tied up at one of the last two bollards.
As the water entered the lock, the bollard rose with it. Very clever. We could keep the same mooring line attached while being lifted the full 23 metres.
There was plenty of traffic on the canal.
Along the way we met more than 30 long barges coming the other way and overtook three ourselves – a somewhat nerve-racking experience when you are passing a 150-metre barge without knowing whether another one is coming around the next bend.
Onto the Mittelland Canal
After a couple of long hours, we reached the Mittelland Canal, turned to starboard – sorry, right – and continued until we reached the Salzgitter branch canal.
We followed it for a couple of kilometres until we reached Heidanger harbour, an old gravel pit that had been converted into a marina.
Over the past three days, we had travelled 114 nautical miles – sorry, 205 kilometres – south and were now about 60 kilometres east of Hanover.
It was very hot, with temperatures reaching 31°C. But a change was forecast for Friday: rain and temperatures almost cut in half.